1. Antonov A.V., Polyakov A.A., Chepurko V.A. (2011). A model for analyzing the reliability of objects with incomplete restoration. Dependability, 3 (38), 33–41 (in Russian).
2. Antonov A.V., Plyaskin A.V., Tataev Kh.N. (2013). On the issue of reliability calculation for redundant structures in view of ageing elements. Dependability, 1, 55–67 (in Russian)]. DOI: 10.21683/1729-2646-2013-0-1-55-67 (in Russian).
3. Aven T. (1983). Optimal replacement under a minimal repair strategy. Advances in Applied Probability, 15, 1, 198–211. DOI: 10.2307/1426990
4. Bartholomew-Biggs M., Zuo M. J., Li X. (2009). Modelling and optimizing sequential imperfect preventive maintenance. Reliability Engineering & System Safety, 94, 53–62. DOI: 10.1016/j.ress.2008.03.002
5. Fedotova M.A. (ed.). (2018). Machinery and Equipment Valuation. Textbook. 2nd ed. Мoscow: INFRA-M. 324 p.
6. Horenbeek A. van, Pintelon L., Muchiri P. (2010). Maintenance optimization models and criteria. International Journal of System Assurance Engineering and Management, 1 (3), 189–200. DOI: 10.1007/s13198-011-0045-x
7. IVS (2019). Effective 31 January 2020. London: International Valuation Standards Council.
8. Jiang R. (2018). Performance evaluation of seven optimization models of age replacement policy. Reliability Engineering & System Safety, 180 (C), 302–311. DOI: 10.1016/j.ress.2018.07.030
9. Kijima M. (1989). Some results for repairable systems with general repair. Journal of Applied Probability, 26, 89–102.
10. Livshits V. N., Smolyak S. A. (1972). Economic and mathematical models of local optimization. In: Proceedings of the Fourth school on mathematical programming and related issues. Issue IV. Moscow, CEMI RAS, 179–213 (in Russian).
11. Livshits V.N., Smolyak S.A. (1971). Service life of fixed assets in the optimal plan. In: The first conference on optimal planning and management of the national economy. Abstracts of reports. Section 1. Issue 1. Moscow: CEMI RAS. 352–357 (in Russian).
12. Methodological recommendations for evaluating the efficiency of investment projects. Second edition (2000). Moscow: Ekonomika 421 p. (in Russian).
13. Mikerin G.I., Smolyak S.A. (2010). Efficiency assessment of investment projects and property valuation: Opportunities for convergence. Moscow: CEMI RAS. 120 p. (in Russian).
14. Smolyak S.A. (1988). Optimization of management of the development of diversified industries. Dr. Econ. Sci. Diss. 08.00.13. Moscow: CEMI RAS (in Russian).
15. Smolyak S.A. (2013). Valuation of machines and equipment in view of curable and incurable depreciation. Economics and Mathematical Methods, 49, 1, 54–72 (in Russian).
16. Smolyak S.A. (2014). Overhaul policy optimization and equipment appraisal concerning its reliability, 2 (22), 102–131 (in Russian).
17. Smolyak S.A. (2016). Valuation of machinery and equipment (secrets of the DCF method). Moscow: Option (in Russian).
18. Smolyak S.A. (2018). On the cost approach to the machinery and equipment valuation. Bulletin of CEMI. Issue 1. DOI: 10.18254/S0000090-2-1 (in Russian).
19. Smolyak S.A. (2019). Optimization of the number and frequency of repairs. Economics of Contemporary Russia, 2, 84–103. DOI: 10.33293/1609-1442-2019-2(85)-84-103 (in Russian).
20. Vilensky P.L., Livshits V.N., Smolyak S.A. (2015). Evaluation of the efficiency of investment projects: Theory and practice. Textbook. 5th ed. Moscow: PolyPrintService 1300 p. (in Russian).
21. Welch R.B. (1943). Depreciation of buildings for assessing purposes. Chicago: International association of assessing officers.
Comments
No posts found